Case studies

solar pv

Solar PV System for Wedding Venue

Bedfordshire Wedding Venue: Solar PV System

A Bedfordshire wedding venue achieved a 221% ROI from a 190kW ground-mounted solar system, despite significant heritage planning constraints.

221% ROI · 5.5 year payback

biomass

Biomass solution at Derwent Manor

Derwent Manor Hotel: Biomass Heating

A Northumberland hotel and spa replaced LPG, oil, and electric heating with six 60kW biomass boilers and cut heating costs by 50%.

50% cost reduction · 4 year payback

chp

Redworth Hall CHP System

Redworth Hall Hotel: CHP System

A Grade II-listed 17th-century mansion house hotel and spa installed a 140kW CHP unit and achieved a 90% reduction in grid electricity reliance.

90% grid reduction · 3.5 year payback

solar pv

Solar PV for manufacturing

Manufacturer: Solar PV System

A Cambridgeshire manufacturer cut electricity costs by 42% with zero disruption to production.

347% ROI · 4 year payback

heat pumps

Scheduled Monument ASHP

Scheduled Monument Site: ASHP Installation

A Bedfordshire wedding venue replaced all oil-fired boilers with Mitsubishi air source heat pumps, cutting carbon by 55 tonnes annually.

55 tonnes CO2 saved · 5 year payback